Identifying the Issue
This 19th-century row house had severe water damage due to a failing built-up roof system. Access was extremely limited due to the urban environment.
FIG 1.1 - COMPLETED INSTALLATION
02 // The Solution
Precision Execution
Utilizing a crane for material delivery, we installed a fully tapered insulation system to correct drainage issues, followed by a 60-mil TPO membrane for superior UV reflection and longevity.
- Full Deck Inspection
- Premium Underlayment
- Daily Cleanup